Questions, answered plainly

Everything a brand asks before its first order.

Twelve answers on minimums, sampling, lead times, certificates and payment terms, in the order these questions usually arrive. If yours is not here, ask it on the form and we will answer in writing.

Folded sweaters, sewing tools, and a measuring tape on a workshop table with a woman working behind it.
Before you commit

Minimums, sampling and what it costs to find out.

Where a figure differs by style or construction we confirm it for your order rather than publish an average, and development costs are quoted before any work starts.

It depends on the route and the fabric, so we confirm it per style rather than publish one number. White label blanks carry the lower entry point, ordered per style and colourway. Custom production depends on the construction and on the fabric's own minimum, which is why it is quoted with the price rather than before it.

Yes, and that is the point of running both. On white label you are buying a finished garment, so the minimum is set by what is in stock and the colourway. Custom starts with pattern development and a fabric order, so it carries a development cost and a higher quantity. Plenty of brands start on blanks and move to custom once a style sells.

A sample is $100 USD, with courier charged on top. One sample per style is deducted from your invoice when you place the bulk order, so on a style you go ahead with, the sampling ends up costing you the delivery. Pattern development and any extra revision rounds are quoted against the style, and every figure reaches you in writing before work starts rather than at the end of it.

No. A sketch, a reference garment you already sell or a clear description is enough to open the conversation. We tell you what is missing from it and what developing the rest adds to the cost, so it does not turn up as a surprise at the quote.

Yes, and on custom work it is the only way in. We make a fit sample and revise it until you sign it off, and no bulk fabric is cut before that approval. White label orders skip this step, because the garment already exists and you are choosing from the range.

Bulk production is paid in stages, and there are two ways to do it. On the three-stage split you pay 30% when you place the order, 40% when the fabric is finished and released to garment production, and 30% before the goods ship. If you would rather make fewer payments, it is 60% on placement and 40% before delivery. Development and sampling are separate and paid before that work begins. The figures and the dates sit on the quote, so nothing changes after you commit.

How to get a fast number

Four things decide your price.

Send these and the first reply can carry a real figure instead of another question. You do not need all four to enquire, but each one shortens the thread.

  • description

    The garment: a sketch, a tech pack, or a style from our blank range.

  • inventory_2

    A rough quantity per style. A range is fine, because quantity changes the price rather than whether we quote.

  • texture

    Any fibre or fabric preference, or the budget per unit you are working to.

  • event_available

    The date you need stock on the shelf, so lead time can be checked against it.

Sewing materials, fabric swatches, tools, and a tablet arranged on a wooden worktable.
After you order

Lead times, checks and paperwork.

What happens between an approved sample and a carton at your door, including the parts we arrange rather than hold ourselves.

It depends on fabric availability and the quantity, so the schedule is dated to your order rather than averaged across the year. You get those dates at the sample stage, with the lead time attached to each stage, and we tell you straight away if anything moves.

At four gates: the pre-production sample you sign off, four-point inspection on every roll of fabric when it arrives at the floor, in-line measurement and seam checks on the first pieces of every run, and a final AQL audit before packing. The inspection report goes to you with the goods.

GOTS, BCI, OEKO-TEX and GRS. They are arranged through the mills and suppliers as part of bulk production, so the certificate is issued against your order rather than held by us in advance. Name the one your buyer needs on the form and we will tell you what it means for your fabric and your timeline.

FOB or delivered to your door, whichever suits your freight setup. Packing follows your carton spec and label instructions, and the final inspection report travels with the shipping documents.

Yes. Every style carries its own minimum and its own stock or development position, so a new style is added as its own line rather than folded into an existing one. The price list confirms what that minimum is for the styles you want.

You own the pattern developed for your product, and it stays yours after the order ships. We do not send an NDA automatically, but if your process needs one before you share a tech pack or artwork, we will sign yours.

Ask it directly

If it is not on this page, ask a person.

Send the question with your quantity and what you are making. You get a written answer within two working days, and asking commits you to nothing.